Train Working : Swanage 1954 to 1961

Last updated: 18 January 2002

This page is maintained using SpiderWriter.  Please advise John Walker if you have any problems with it.

Go back to Train Working : Swanage

References:
     BR Operating History SR Part 3 Wessex Working Timetable 1954
     Railway Modeller January 1971 Working Timetable Swanage Branch Summer 1956
     Passenger Services Timetable 17th June to 15th September 1957
     Working Timetable of Passenger Trains 16th September 1957, until further notice
     Passenger Services Timetable 12th June to 10th September 1961
     Working Timetable of Passenger Trains 14th June 1965 to 17th April 1966, or until further notice
     Carriage Working Notice Loco-hauled Trains 14th June to 5th September 1965
     Southern Regions Engine Workings published by OPC Bournemouth 1966
     LSWR Locomotives The Drummond Classes by D.L.Bradley

The following table is based on train workings at Swanage in 1954 as described in BR Operating History SR Part 3 Wessex published by Xpress Publishing.  Workings up to 1961 have been superimposed to provide more intensive services and to show the changes over that period.  There are many outstanding questions and hypotheses indicated in italics.  I would welcome further input on these or any other comments.  Please send comments to: John Walker

Main - platform 1
Bay - siding 1; goods shed - siding 2 ...

Where were push pull coaches and Waterloo coaches berthed overnight?  I have pictures of the Royal Wessex coaches in the bay.  Did they remain there overnight?

How were Waterloo coaches detached from push pulls?  I have assumed the train from Wareham would arrive in the main platform with the Waterloo coaches on the Wareham end, then:
- M7 and pushpull push Waterloo coaches in front of signal box
- M7 and pushpull detach and set back into main platform
- M7 and pushpull run round Waterloo coaches
- M7 and pushpull push Waterloo coaches into main platform, or bay platform, or couple up and transfer to siding 3, 4 or 5

How did the goods run round?  I have assumed the goods would arrive in front of signal box then:
- if goods does not fit in loop excess wagons pushed in to headshunt
- loco runs round wagons using loop from double slip to crossover in front of engine shed
- wagons shunted into yard
- similarly any remaining wagons in headshunt run round and shunted into yard

At what point in shunting did goods loco visit turntable?

How often did push pull locos need to visit shed?  Presumably they uncoupled from coaches?

Did T9 from Salisbury stay on shed all day? 

At start of day:

Shed - M7 (ex BM408) SWA421
Siding 2 (bay),3,4,5 - 2 coaches (ex 1030 Waterloo), 2 coaches (ex 1635 Waterloo), 2 Royal Wessex (ex 1830 Waterloo) + Pushpull (ex PP2) PP3 

1965/6 Bournemouth Loco BM405 2MT 2-6-2T Ivatt
                                          BM407 4MT 2-6-4T BR Standard
                                          BM408 4MT 2-6-4T BR Standard
            Swanage Shed       BM409 (ex BM408) 4MT 2-6-4T BR Standard
            Swanage Siding 2 (bay),3,4,5 - 2-set(R)/2 (ex 2-set(R)/1)
            Wareham                               - 2-set(R)/1

End of day:

1965/6 Bournemouth Loco BM405 2MT 2-6-2T Ivatt
                                          BM407 4MT 2-6-4T BR Standard
                                          BM409 4MT 2-6-4T BR Standard
            Swanage Shed       BM408 4MT 2-6-4T BR Standard

Bogie coaches were not allowed in siding 6.

According to Bradley (p158), in mid-1949 a Bournemouth 700 usually spent the day on the Swanage branch substituting for an 'M7'.  The Bournemouth allocation at that time was :  30695, 30696, 30700.  Presumably this would be on H.Jn.422? 

According to BR Operating History a Swanage M7 double-headed the 17.41 Weymouth stopping train from Wareham.

Train Arr Dep Destination
0520 Wareham News (1957 suspended) 0543 (1956/7) 0553 1956 LE Hamworthy Junction
0550 1965 LE Bournemouth Central 0646 1965

0547 Bournemouth Central Motor
         PP1 + M7 BM407 facing Wareham

0635 1965/6 Wareham BM405 + 2-set (R)/1 ECS
         BM405 run round

0639 (1956)
0648 Bay
0650 (1961)
0657 1965/6
         Main 
0715 Bay


0715 1965/6
         Main
Bournemouth West


Wareham
         M7 SWA421 off shed to collect PP3 + 2 Royal Wessex coaches from siding  3/4/5
         M7 SWA421 facing Wareham + PP3 + 2 Royal Wessex coaches
         1965/6 BM409 collect 2-set (R)/2 from berth
0736 Main
0738 1956/7/61
0740 1965/6
Waterloo (Royal Wessex)

Wareham

0651 Christchurch
         M7 BM410 (pushpull fitted?)  +
4 coaches to Main
         RM Jan 71 - 1956 3-set + 2-6-0
         Runround and collect 2 coaches from siding 3/4/5

0840 Main


0818 1965/6 Wareham BM405 + 2-set (R)/1 + 1 S.O.
         BM405 run round
         Shunt to bay
0840 1965/6
         Main

0831 Wareham Motor
         PP3 + M7 SWA421 facing Wareham
0831 1965/6 Wareham BM409 + 2-set (R)/2
         BM409 run round

0853 Bay

0853 1965/6
         Main

0858 Bay

Wareham Motor

         1965/6 Wareham BM405 + 2-set (R)/1 + 1 S.O.
0855 1965/6
         Bay
Wareham

         M7 BM410 facing Wareham +  2 Waterloo + 4 Christchurch
         Waterloo or Christchurch coaches next to M7?
         1965/6 Wareham BM409 + 2-set (R)/2


0920 1957/61
0924 Main
0920 1965/6
         Main

Waterloo

Wareham

0655 Hamworthy Junc Goods
         M7 H.Jn 422 + max 22 wagons
         Loops not long enough to run round 22 wagons
         Run to bay line.  Reverse into headshunt if required.
         Run round in front of signal box as required.
       
  Shunt yard.

0820 (1956)
0952

0947 Wareham Motor
         1954 PP2 + M7 BM407 facing Wareham
         1956/7/61 PP3 + M7 SWA421

         Swanage Railway in Colour p27 1960
0950 1965/6 Wareham BM405 + 2-set (R)/1 + 1 S.O.
         1965/6 BM405 run round
         1965/6 S.O. to berth

1004 (1961)
1009 Main

Main
1012 1965/6
Main
0850 Salisbury 22 July to 30 August 1957 and 24 July to 25 August 1961
         RM Jan 71 - 1956 T9
1025 (1956/7)
         Wareham Motor 1956/7/61 PP3 + M7 SWA421
         1965/6 BM405 + 2-set(R)/1
1030 1956/7/61
1030 1965/6 Main
Wareham
Wareham
         M7 H.Jn 422 + max 22 wagons.
         Assemble in siding 3/4/5.   M7 to shed to turn and service.
0940 1954
1045 Siding 3/4/5

Wareham Goods
Swanage Railway in Colour p36 1961

1025 1961    Wareham Motor PP2 + M7 BM407
1030 1956/7 Wareham Motor PP2 + M7 BM407
1025 1965/6 Wareham BM409 + 2-set(R)/2
                      BM409 run round
1051 (1961)
1053 (1956/7)
1051 1965/6 Main
         PP2 + M7 BM407 facing Wareham 1106 Main
1110 1957/61 
Wareham Motor
1106 Wareham Motor
         PP3 + M7 SWA421 facing Wareham
1110 1956/61
         1965/6 Wareham BM409 + 2-set(R)/2
1128 Main

1132 (1956/7/61)
1136 Main
1140 1956/7/61

1133 1965/6 Main
Wareham Motor


Wareham
1128 1965/6 Wareham BM405 + 2-set(R)/1
                      BM405 run round
1154 1965/6 Main
0915 Basingstoke 1 July to 6 September 1957
0955 Eastleigh 1956 + 10 July to 1 September 1961
         RM Jan 71 - 1956 Maunsell 2-6-0
1201 (1957)
1201 (1956/61)
1157 Wareham Motor
         PP2 + M7 BM407 facing Wareham
1200 Wareham Motor (1961)
1219 Main


1222 (1956/7/61)
         1965/6 BM405 + 2-set(R)/1 1225 1965/6 Main Wareham BM409 to freight at Wareham?
1216 Wareham Motor
         PP3 + M7 SWA421
1227 Wareham Motor (1961)
1221 1965/6 Wareham BM409 + 2-set(R)/2
                      BM409 run round
1238 Bay
1249 1957
1249 1961
1247 1965/6 Main
         PP2 + M7 BM407 facing Wareham
1228 1957/61
1242 Main
Wareham Motor
         M7 SWA421 + PP3 collect 2 coaches for Waterloo from siding 3
         M7 SWA421 facing Wareham + PP3 + 2 coaches
        1965/6 BM + 2-set (R)/2
1333 Main

1328 1965
Waterloo

Wareham

1030 Waterloo
         PP2 + M7 BM407 facing Wareham + 2 coaches from Waterloo
        Shunt 2 coaches to front of signal box.  PP2 + M7 run round.
        2 coaches to siding 3/4/5.  PP2 + M7 BM407 to Main
1325 1965/6 Wareham BM407 + 2-set(R)/1
         BM407 run round

1327 (1957)
1327 (1961)
1354 Main

1351 1965/6 Main
1405 1965?
1416 Wareham Motor
         PP3 + M7 SWA421 facing Wareham
1420 Wareham Motor (1961)
1410 1965/6 Wareham BM + 2-set(R)/2
1438 Bay

1442 (1961)
1432 1965/6 Main
         PP2 + M7 BM407 facing Wareham

         1965/6 BM407 + 2-set(R)/1
1442 Main
1445 1957/61
1435 1965/6
Wareham Motor

Wareham
1537 Wareham Motor
         PP2 + M7 BM407 facing Wareham
1540 1965/6 Wareham BM407 + 2-set(R) 1
1559 Main

1602 1965
         PP3 + M7 SWA421 facing Wareham collects PP5 from siding 3/4/5 or headshunt?
         PP5 + PP3 + M7 SWA421 facing Wareham



         1965/6 BM407 + 1 S.O. from berth + 2-set(R) 1
1623 Bay 1956/7
1623 1961 

1604 Main
1620 1965
Wareham Motor
Swanage Railway in Colour p41 1962
Around the Branch Lines pl154

Wareham
1545 LE Bournemouth Central (suspended) 1645 (1956/7)
         PP2 + M7 BM407 facing Wareham


         BM 405 2-set(R) 2
1700 Main
1702 1961
1710 1956
1703 1965
Wareham Motor


Wareham (then Dorchester S and Bournemouth)

1657 Wareham Motor
         PP5 + PP3 + M7 SWA421 facing Wareham
         Shunt PP5 to siding 3/4/5 or headshunt?
1702 Wareham Motor (1961)
1703 1965/6 BM407 + Wareham 2-set(R) 1 + 1 S.O. 

1721 Main


1724 (1961)
1726 1965
1738 Main



1738 1965
Wareham Motor



Wareham
         1956 T9 1805 (1956/7/61) Salisbury Summer 1956
Salisbury 22 July to 30 August 1957
Salisbury 24 July to 25 August 1961
1830 (1957, 1961) Basingstoke 1 July to 6 September 1957
Eastleigh 10 July to 1 september 1961

1700 Bournemouth Central Motor
         PP4 + M7 BM408 facing Wareham
          Swanage Railway in Colour p26 1957
         Branch Lines of the SR Vol 1 p119
         1956 + through coaches to Eastleigh
 
         1965 2-set(R) 3
1702 1966 BM408 4MT 2-6-4T BR Standard + 2-set(R) 3

1800 Main

Bay
Main

1800 1965
1800 1966

1830 (1956/7/61)
1836 Main

Bay
Main
1817 1965
1817 1966

Wareham Motor
(to 28 June, from 9 September 1957)
(to 7 July, from 4 September 1961)


Wareham
Wareham
1827 Wareham Motor (1961)
1833 Wareham Motor
         PP3 + M7 SWA421 facing Wareham
1813 1965/6 Wareham BM407 + 2-set(R) 1 + 1 S.O.
1851 (1956/7/61)

1857 Main
1839 1965



1853 1965



Wareham
1635 Waterloo ("Royal Wessex" 1957 and 1961)
         PP2 + M7 BM408 facing Wareham + 2 coaches from Waterloo
1852 1965/6 Wareham BM408 2-set(R) 3
1952 Bay?

1914 1965
1945 1965/6 Wareham BM407 + 2-set(R) 1 2007 1965
         1965/6 LE BM407 2010 1965/6
         PP3 + M7 SWA421 facing Wareham
         1965 BM408 + 2-set(R) 1 + 2-set(R) 3

2010 Main
2025 1965
Wareham Motor
Wareham
         Shunt 2 coaches to front of signal box.  PP2 + M7 run round.
         2 coaches to siding 3/4/5
         PP2 + M7 BM408
2120 Main
2135 (1957)
2138 (1961)
Wareham Motor

1830 Waterloo (Royal Wessex?)
         PP3 + M7 SWA421 facing Wareham + 2 Royal Wessex
         Shunt 2 Royal Wessex to front of signal box.
         PP3 + M7 run round.
         2 Royal Wessex to siding 2/3/4/5
2125 1965 Wareham BM408 2-set(R) 1
         1965/6  BM408 to shed, 2-set(R) 1 to berth

2131 (1957)
2134 (1961)
2142 Main


2147 1965
2149 1966
         PP3 + M7 SWA421 facing Wareham 2204 Main
2211 (1957)
2217 (1961)
Wareham Motor
1956 ECS Wareham to Bournemouth?
2204 Wareham Motor
          PP2 + M7 BM408 facing Wareham
          PP2 to siding 3/4/5, M7 to shed
1017 Wareham Motor (1961)
2226 Main
2232 (1957)

2239 (1961)