Train Working : Swanage 1954 to 1961
This page is maintained using SpiderWriter. Please advise John Walker if you have any problems with it.
Go back to Train Working : Swanage
References:
BR
Operating History SR Part 3 Wessex Working Timetable
1954
Railway Modeller January 1971 Working Timetable
Swanage Branch Summer 1956
Passenger Services Timetable 17th
June to 15th September 1957
Working Timetable of
Passenger Trains 16th September 1957, until further
notice
Passenger Services
Timetable 12th June to 10th September 1961
Working
Timetable of Passenger Trains 14th June 1965 to 17th April 1966, or until
further notice
Carriage Working Notice Loco-hauled
Trains 14th June to 5th September 1965
Southern Regions Engine Workings
published by OPC Bournemouth 1966
LSWR Locomotives
The Drummond Classes by D.L.Bradley
The following table is based on train workings at Swanage in 1954 as described in BR Operating History SR Part 3 Wessex published by Xpress Publishing. Workings up to 1961 have been superimposed to provide more intensive services and to show the changes over that period. There are many outstanding questions and hypotheses indicated in italics. I would welcome further input on these or any other comments. Please send comments to: John Walker
Main - platform 1
Bay - siding 1; goods shed - siding 2 ...
Where were push pull coaches and Waterloo coaches berthed overnight? I have pictures of the Royal Wessex coaches in the bay. Did they remain there overnight?
How were Waterloo coaches detached from push
pulls? I have assumed the train from Wareham would arrive in the main
platform with the Waterloo coaches on the Wareham end, then:
- M7 and
pushpull push Waterloo coaches in front of signal box
- M7 and pushpull
detach and set back into main platform
- M7 and pushpull run round Waterloo
coaches
- M7 and pushpull push Waterloo coaches into main platform, or bay
platform, or couple up and transfer to siding 3, 4 or 5
How did the goods run round? I have assumed the goods would arrive
in front of signal box then:
- if goods does not fit in loop excess wagons
pushed in to headshunt
- loco runs round wagons using loop from double slip
to crossover in front of engine shed
- wagons shunted into yard
-
similarly any remaining wagons in headshunt run round and shunted into
yard
At what point in shunting did goods loco visit turntable?
How often did push pull locos need to visit shed? Presumably they uncoupled from coaches?
Did T9 from Salisbury stay on shed all day?
At start of day:
Shed - M7 (ex BM408) SWA421
Siding 2
(bay),3,4,5 - 2 coaches (ex 1030 Waterloo), 2 coaches (ex 1635 Waterloo), 2
Royal Wessex (ex 1830 Waterloo) + Pushpull (ex PP2) PP3
1965/6 Bournemouth Loco BM405 2MT 2-6-2T
Ivatt
BM407 4MT 2-6-4T BR
Standard
BM408 4MT 2-6-4T BR
Standard
Swanage Shed BM409 (ex BM408) 4MT 2-6-4T BR
Standard
Swanage Siding 2 (bay),3,4,5 - 2-set(R)/2 (ex
2-set(R)/1)
Wareham
- 2-set(R)/1
End of day:
1965/6 Bournemouth Loco BM405 2MT 2-6-2T
Ivatt
BM407 4MT 2-6-4T BR
Standard
BM409 4MT 2-6-4T BR
Standard
Swanage Shed BM408 4MT 2-6-4T BR
Standard
Bogie coaches were not allowed in siding 6.
According to Bradley (p158), in mid-1949 a Bournemouth 700 usually spent the day on the Swanage branch substituting for an 'M7'. The Bournemouth allocation at that time was : 30695, 30696, 30700. Presumably this would be on H.Jn.422?
According to BR Operating History a Swanage M7 double-headed the 17.41 Weymouth stopping train from Wareham.
| Train | Arr | Dep | Destination |
| 0520 Wareham News (1957 suspended) | 0543 (1956/7) | 0553 1956 | LE Hamworthy Junction |
| 0550 1965 LE Bournemouth Central | 0646 1965 | ||
|
0547 Bournemouth Central
Motor |
0639
(1956) 0648 Bay 0650 (1961) 0657 1965/6 Main |
0715
Bay 0715 1965/6 Main |
Bournemouth
West Wareham |
| M7
SWA421 off shed to collect PP3 + 2 Royal Wessex coaches from siding
3/4/5 M7 SWA421 facing Wareham + PP3 + 2 Royal Wessex coaches 1965/6 BM409 collect 2-set (R)/2 from berth |
0736 Main 0738 1956/7/61 0740 1965/6 |
Waterloo (Royal
Wessex) Wareham | |
|
0651
Christchurch |
0840
Main |
||
| 0818 1965/6 Wareham BM405 + 2-set (R)/1 + 1
S.O. BM405 run round Shunt to bay |
0840
1965/6 Main |
||
|
0831 Wareham
Motor |
0853
Bay 0853 1965/6 Main |
0858
Bay |
Wareham
Motor |
| 1965/6
Wareham BM405 + 2-set (R)/1 + 1 S.O. |
0855
1965/6 Bay |
Wareham | |
|
M7
BM410 facing Wareham + 2 Waterloo + 4
Christchurch |
0920 1957/61 |
Waterloo Wareham | |
|
0655 Hamworthy
Junc Goods |
0820
(1956) 0952 |
||
|
0947 Wareham
Motor |
1004
(1961) 1009 Main Main 1012 1965/6 Main |
||
| 0850 Salisbury
22 July to 30 August 1957 and 24 July to 25 August
1961 RM Jan 71 - 1956 T9 |
1025 (1956/7) | ||
| Wareham
Motor 1956/7/61 PP3 + M7
SWA421 1965/6 BM405 + 2-set(R)/1 |
1030
1956/7/61 1030 1965/6 Main |
Wareham Wareham | |
| M7
H.Jn 422 + max 22 wagons. Assemble in siding 3/4/5. M7 to shed to turn and service. |
0940
1954 1045 Siding 3/4/5 |
Wareham Goods | |
| 1025
1961 Wareham Motor PP2 + M7 BM407 1030 1956/7 Wareham Motor PP2 + M7 BM407 1025 1965/6 Wareham BM409 + 2-set(R)/2 BM409 run round |
1051 (1961) 1053 (1956/7) 1051 1965/6 Main |
||
| PP2 + M7 BM407 facing Wareham | 1106 Main 1110 1957/61 |
Wareham Motor | |
| 1106 Wareham
Motor PP3 + M7 SWA421 facing Wareham 1110 1956/61 1965/6 Wareham BM409 + 2-set(R)/2 |
1128
Main 1132 (1956/7/61) |
1136
Main 1140 1956/7/61 1133 1965/6 Main |
Wareham
Motor Wareham |
| 1128 1965/6
Wareham BM405 +
2-set(R)/1 BM405 run round |
1154 1965/6 Main | ||
| 0915 Basingstoke 1 July to 6 September 1957 0955 Eastleigh 1956 + 10 July to 1 September 1961 RM Jan 71 - 1956 Maunsell 2-6-0 |
1201 (1957) 1201 (1956/61) |
||
| 1157 Wareham
Motor PP2 + M7 BM407 facing Wareham 1200 Wareham Motor (1961) |
1219
Main 1222 (1956/7/61) |
||
| 1965/6 BM405 + 2-set(R)/1 | 1225 1965/6 Main | Wareham BM409 to freight at Wareham? | |
| 1216 Wareham
Motor PP3 + M7 SWA421 1227 Wareham Motor (1961) 1221 1965/6 Wareham BM409 + 2-set(R)/2 BM409 run round |
1238
Bay 1249 1957 1249 1961 1247 1965/6 Main |
||
| PP2
+ M7 BM407 facing
Wareham |
1228
1957/61 1242 Main |
Wareham
Motor | |
| M7
SWA421 + PP3 collect 2 coaches for Waterloo from siding
3 M7 SWA421 facing Wareham + PP3 + 2 coaches 1965/6 BM + 2-set (R)/2 |
1333
Main 1328 1965 |
Waterloo Wareham | |
|
1030
Waterloo |
1327
(1957) 1327 (1961) 1354 Main 1351 1965/6 Main |
||
| 1405 1965? | |||
| 1416 Wareham
Motor PP3 + M7 SWA421 facing Wareham 1420 Wareham Motor (1961) 1410 1965/6 Wareham BM + 2-set(R)/2 |
1438
Bay 1442 (1961) 1432 1965/6 Main |
||
| PP2
+ M7 BM407 facing
Wareham 1965/6 BM407 + 2-set(R)/1 |
1442
Main 1445 1957/61 1435 1965/6 |
Wareham
Motor Wareham | |
| 1537 Wareham
Motor PP2 + M7 BM407 facing Wareham 1540 1965/6 Wareham BM407 + 2-set(R) 1 |
1559
Main 1602 1965 |
||
| PP3 + M7 SWA421 facing Wareham collects PP5
from siding 3/4/5 or
headshunt? PP5 + PP3 + M7 SWA421 facing Wareham 1965/6 BM407 + 1 S.O. from berth + 2-set(R) 1 |
1623 Bay
1956/7 1623 1961 1604 Main 1620 1965 |
Wareham
Motor Swanage Railway in Colour p41 1962 Around the Branch Lines pl154 Wareham | |
| 1545 LE Bournemouth Central (suspended) | 1645 (1956/7) | ||
| PP2
+ M7 BM407 facing
Wareham BM 405 2-set(R) 2 |
1700 Main 1702 1961 1710 1956 1703 1965 |
Wareham
Motor Wareham (then Dorchester S and Bournemouth) | |
|
1657 Wareham
Motor |
1721
Main 1724 (1961) 1726 1965 |
1738
Main 1738 1965 |
Wareham
Motor Wareham |
| 1956 T9 | 1805 (1956/7/61) | Salisbury
Summer 1956 Salisbury 22 July to 30 August 1957 Salisbury 24 July to 25 August 1961 | |
| 1830 (1957, 1961) | Basingstoke 1 July to 6 September 1957 Eastleigh 10 July to 1 september 1961 | ||
|
1700 Bournemouth
Central Motor |
1800 Main Bay Main 1800 1965 1800 1966 |
1830
(1956/7/61) |
Wareham
Motor (to 28 June, from 9 September 1957) (to 7 July, from 4 September 1961) Wareham Wareham |
| 1827 Wareham
Motor (1961) 1833 Wareham Motor PP3 + M7 SWA421 facing Wareham 1813 1965/6 Wareham BM407 + 2-set(R) 1 + 1 S.O. |
1851
(1956/7/61) 1857 Main 1839 1965 |
1853 1965 |
Wareham |
| 1635 Waterloo
("Royal Wessex" 1957 and
1961) PP2 + M7 BM408 facing Wareham + 2 coaches from Waterloo 1852 1965/6 Wareham BM408 2-set(R) 3 |
1952
Bay? 1914 1965 |
||
| 1945 1965/6 Wareham BM407 + 2-set(R) 1 | 2007 1965 | ||
| 1965/6 LE BM407 | 2010 1965/6 | ||
| PP3
+ M7 SWA421 facing
Wareham 1965 BM408 + 2-set(R) 1 + 2-set(R) 3 |
2010
Main 2025 1965 |
Wareham
Motor Wareham | |
|
Shunt 2 coaches to front of signal box. PP2 + M7 run
round. 2 coaches to siding 3/4/5 PP2 + M7 BM408 |
2120 Main 2135 (1957) 2138 (1961) |
Wareham Motor | |
|
1830 Waterloo
(Royal Wessex?) |
2131
(1957) 2134 (1961) 2142 Main 2147 1965 2149 1966 |
||
| PP3 + M7 SWA421 facing Wareham | 2204 Main 2211 (1957) 2217 (1961) |
Wareham
Motor 1956 ECS Wareham to Bournemouth? | |
| 2204 Wareham
Motor PP2 + M7 BM408 facing Wareham PP2 to siding 3/4/5, M7 to shed 1017 Wareham Motor (1961) |
2226
Main 2232 (1957) 2239 (1961) |