Train Working : Swanage 1954 to 1961
This page is maintained using SpiderWriter. Please advise John Walker if you have any problems with it.
References:
Southern Region
Engine Workings
The following table is based on train workings at Swanage in 1954 as described in BR Operating History SR Part 3 Wessex published by Xpress Publishing. Workings up to 1961 have been superimposed to provide more intensive services and to show the changes over that period. There are many outstanding questions and hypotheses indicated in italics. I would welcome further input on these or any other comments. Please send comments to: John Walker
Go back to Train Working : Swanage
Main - platform 1
Bay - siding 1; goods shed - siding 2 ...
Where were push pull coaches and Waterloo coaches berthed overnight? I have pictures of the Royal Wessex coaches in the bay. Did they remain there overnight?
How were Waterloo coaches detached from push
pulls? I have assumed the train from Wareham would arrive in the main
platform with the Waterloo coaches on the Wareham end, then:
- M7 and
pushpull push Waterloo coaches in front of signal box
- M7 and pushpull
detach and set back into main platform
- M7 and pushpull run round Waterloo
coaches
- M7 and pushpull push Waterloo coaches into main platform, or bay
platform, or couple up and transfer to siding 3, 4 or 5
How did the goods run round? I have assumed the goods would arrive
in front of signal box then:
- if goods does not fit in loop excess wagons
pushed in to headshunt
- loco runs round wagons using loop from double slip
to crossover in front of engine shed
- wagons shunted into yard
-
similarly any remaining wagons in headshunt run round and shunted into
yard
At what point in shunting did goods loco visit turntable?
How often did push pull locos need to visit shed? Presumably they uncoupled from coaches?
Did T9 from Salisbury stay on shed all day?
At start of day:
Shed - M7 (ex BM408) SWA421
Siding 2
(bay),3,4,5 - 2 coaches (ex 1030 Waterloo), 2 coaches (ex 1635 Waterloo), 2
Royal Wessex (ex 1830 Waterloo) + Pushpull (ex PP2) PP3
Bogie coaches were not allowed in siding 6.
| Train | Arr | Dep | Destination |
| 0520 Wareham News (1957 suspended) | 0543 (1956/7) | 0553 1956 | LE Hamworthy Junction |
|
0547 Bournemouth Central
Motor |
0639
(1956) 0648 Bay 0650 (1961) |
0715 Bay | Bournemouth West |
| M7
SWA421 off shed to collect PP3 + 2 Royal Wessex coaches from siding
3/4/5 M7 SWA421 facing Wareham + PP3 + 2 Royal Wessex coaches |
0736 Main 0738 1956/7/61 |
Waterloo (Royal Wessex) | |
|
0651
Christchurch |
0840 Main | ||
|
0831 Wareham
Motor |
0853 Bay | 0858 Bay | Wareham Motor |
|
M7
BM410 facing Wareham + 2 Waterloo + 4
Christchurch |
0920 1957/61 |
Waterloo | |
|
0655 Hamworthy
Junc Goods |
0820
(1956) 0952 |
||
|
0947 Wareham
Motor |
1004
(1961) 1009 Main Main |
||
| 0850 Salisbury
22 July to 30 August 1957 and 24 July to 25 August
1961 RM Jan 71 - 1956 T9 |
1025 (1956/7) | ||
| Wareham Motor 1956/7/61 PP3 + M7 SWA421 | 1030 1956/7/61 | Wareham | |
| M7
H.Jn 422 + max 22 wagons. Assemble in siding 3/4/5. M7 to shed to turn and service. |
0940
1954 1045 Siding 3/4/5 |
Wareham Goods | |
| 1025
1961 Wareham Motor PP2 + M7 BM407 1030 1956/7 Wareham Motor PP2 + M7 BM407 |
1051 (1961) 1053 (1956/7) |
||
| PP2 + M7 BM407 facing Wareham | 1106 Main 1110 1957/61 |
Wareham Motor | |
| 1106 Wareham
Motor PP3 + M7 SWA421 facing Wareham 1110 (1956/61) |
1128
Main 1132 (1956/7/61) |
1136
Main 1140 1956/7/61 |
Wareham Motor |
| 0915 Basingstoke 1 July to 6 September 1957 0955 Eastleigh 1956 + 10 July to 1 September 1961 RM Jan 71 - 1956 Maunsell 2-6-0 |
1201 (1957) 1201 (1956/61) |
||
| 1157 Wareham
Motor PP2 + M7 BM407 facing Wareham 1200 Wareham Motor (1961) |
1219
Main 1222 (1956/7/61) |
||
| 1216 Wareham
Motor PP3 + M7 SWA421 1227 Wareham Motor (1961) |
1238
Bay 1249 (1957) 1249 (1961) |
||
| PP2 + M7 BM407 facing Wareham | 1228
1957/61 1242 Main |
Wareham Motor | |
| M7
SWA421 + PP3 collect 2 coaches for Waterloo from siding
3 M7 SWA421 facing Wareham + PP3 + 2 coaches |
1333 Main | Waterloo | |
|
1030
Waterloo |
1327
(1957) 1327 (1961) 1354 Main |
||
| 1416 Wareham
Motor PP3 + M7 SWA421 facing Wareham 1420 Wareham Motor (1961) |
1438
Bay 1442 (1961) |
||
| PP2 + M7 BM407 facing Wareham | 1442
Main 1445 1957/61 |
Wareham Motor | |
| 1537 Wareham
Motor PP2 + M7 BM407 facing Wareham |
1559 Main | ||
| PP3 + M7 SWA421 facing Wareham collects PP5
from siding 3/4/5 or
headshunt? PP5 + PP3 + M7 SWA421 facing Wareham |
1623 Bay
1956/7 1623 1961 1604 Main |
Wareham
Motor Swanage Railway in Colour p41 1962 Around the Branch Lines pl154 | |
| 1545 LE Bournemouth Central (suspended) | 1645 (1956/7) | ||
| PP2 + M7 BM407 facing Wareham | 1700 Main 1702 1961 1710 1956 |
Wareham Motor | |
|
1657 Wareham
Motor |
1721
Main 1724 (1961) |
1738 Main | Wareham Motor |
| 1956 T9 | 1805 (1956/7/61) | Salisbury
Summer 1956 Salisbury 22 July to 30 August 1957 Salisbury 24 July to 25 August 1961 | |
| 1830 (1957, 1961) | Basingstoke 1 July to 6 September 1957 Eastleigh 10 July to 1 september 1961 | ||
|
1700 Bournemouth
Central Motor |
1800 Main Bay Main |
1830
(1956/7/61) 1836 Main Bay Main |
Wareham
Motor (to 28 June, from 9 September 1957) (to 7 July, from 4 September 1961) |
| 1827 Wareham
Motor (1961) 1833 Wareham Motor PP3 + M7 SWA421 facing Wareham |
1851
(1956/7/61) 1857 Main |
||
| 1635 Waterloo
("Royal Wessex" 1957 and
1961) PP2 + M7 BM408 facing Wareham + 2 coaches from Waterloo |
1952 Bay? | ||
| PP3 + M7 SWA421 facing Wareham | 2010 Main | Wareham Motor | |
|
Shunt 2 coaches to front of signal box. PP2 + M7 run
round. 2 coaches to siding 3/4/5 PP2 + M7 BM408 |
2120 Main 2135 (1957) 2138 (1961) |
Wareham Motor | |
|
1830 Waterloo
(Royal Wessex?) |
2131
(1957) 2134 (1961) 2142 Main |
||
| PP3 + M7 SWA421 facing Wareham | 2204 Main 2211 (1957) 2217 (1961) |
Wareham
Motor 1956 ECS Wareham to Bournemouth? | |
| 2204 Wareham
Motor PP2 + M7 BM408 facing Wareham PP2 to siding 3/4/5, M7 to shed 1017 Wareham Motor (1961) |
2226
Main 2232 (1957) 2239 (1961) |